Foreshore Drainage Stage 2
FDU-S2-2026 · sponsored by Director, Engineering · A. Lieblich PM
Active risks
7 ↓ 2
2 critical · 4 high
Open issues
5
2 high priority
Open RFIs
3
$45k exposure
Budget used
41%
$868k of $2.12M
Top risks · by score
Active register
R-03 Unknown utility services in eastern section 16
R-02 Plant/pedestrian interface near foreshore path 15
R-06 Geotech variation chainage 0+220–0+340 12
R-01 Tidal window narrower than estimated 10
Budget
$2.12M approved
$868k actual $2.08M FAC $42k headroom
Variations in flight
2 · $42k
Recent activity
What's happening
🎙
You captured a 4 min site walkthrough — AI filed 1 risk · 1 issue · 1 RFI · 1 person
2h ago
$
K. Hassan updated B-3.2 Concrete supply · forecast $214k → $228k
5h ago
R-07 closed by D. Rangi — mitigation accepted by sponsor
yesterday
📑
Weekly Status generated and emailed to Sponsor
Mon 09:00
Quick generate
Today's docs
Risks register
10 risks · 7 active · 2 critical
ID Risk · cause · effect Category P × I Score Owner Status
R-03
Unknown utility services in eastern section
No DBYD records past chainage 0+248
Technical 4 × 4
16
K. Hassan Active
R-02
Plant/pedestrian interface near foreshore path
Public walkway adjoins working area
Safety 5 × 3
15
D. Rangi Active
R-06
Geotech variation chainage 0+220–0+340
May require revised bedding spec
Technical 3 × 4
12
K. Hassan Treating
R-01
Tidal window narrower than estimated
Affects pour scheduling Aug–Sep
Programme 5 × 2
10
M. Cole Active
R-04
Contaminated fill in southern area
Lab results pending — disposal cost TBC
Environmental 3 × 3
9
D. Rangi Treating
R-07
Approval delay for road occupancy permit
Closed — accepted by sponsor
Approvals
4
K. Hassan Closed
Templates shelf
Each template renders live from current project state. Open · print · send.
Onboarding
Project Brief
One page · scope · KPIs · top risks/issues/people · money
1 pageauto
Weekly · Status
Status Report
Top risks · open issues · RFIs · variations
2 pagesauto
Governance · Risk
Risk Register
Every risk · 5×5 heat map · cause / effect / mitigation
4 pagesauto
Finance
Budget Snapshot
WBS lines · variance · variations · contingency draws
3 pagesauto
People
Stakeholder Map
Power × interest quadrants · full register
2 pagesauto
Governance · RFI
RFI Log
All RFIs with question · response · exposure
3 pagesauto
Governance · Change
Variations Log
Every CR · status · cost / time impact
3 pagesauto
Coming next
Monthly Summary Daily Site Report Procurement Schedule Lessons Learned Closeout Report Sponsor Letter Subcontractor Variation + Custom
Capture it.
Record a meeting · talk through a site walk · paste a transcript · snap a photo. AI files the lot.
Mode
Recording · site walk
04:12
Live transcript

So we walked the eastern section this morning. Three things came up. First, geotech is worried about ground conditions at chainage 0+340. They reckon the bedding spec needs revising. Probability 4, impact 4 — could delay backfill by a week.

Second, the concrete pour scheduled for Friday is blocked. The supplier emailed they can't deliver until Monday. Need to push the formwork inspection out too.

Third, we need to clarify with Bayswater Civil on the manhole spec — drawings show 1500mm but spec says 1800mm. Either way it's about $11k.

Oh and Mike Chen from Bayswater is the structural lead, influence 4 interest 5, send him weekly...

AI extracted · 4 items
REVIEW BEFORE FILING
RISK
R-11 Ground conditions at 0+340 may delay backfill score 16 · K. Hassan
ISSUE
I-06 Concrete pour blocked — supplier can't deliver til Monday HIGH · M. Cole
RFI
RFI-04 Manhole diameter — 1500mm vs 1800mm spec $11k exposure
PERSON
Mike Chen · Bayswater Civil · Structural lead INF 4 · INT 5
Tips for great capture
  • Talk like you're updating your sponsor — full sentences, names, numbers.
  • Say "risk", "issue", "RFI" out loud when you want the AI to file accordingly — overrides its guess.
  • Long sessions are fine. We chunk + summarise + extract.
  • You can edit any extracted item before filing or delete it entirely.
Issues tracker
5 open · 2 high priority
IDTitle Priority Owner Status
I-05
Comms duct chainage 0+248 not on DBYD records
HighK. HassanNew
I-04
Subcontractor invoicing mismatch $4,200
MediumM. ColeIn progress
I-03
Concrete pour Friday blocked — supplier delay
HighM. ColeBlocked
RFIs
3 open · $45k exposure
IDSubjectToDueStatus
RFI-03
Manhole diameter — drawings vs spec
Bayswater CivilJun 12Awaiting
RFI-02
Cathodic protection spec for new mains
Council EngineerJun 18Logged
RFI-01
Easement boundary chainage 0+580
SurveyorJun 10Awaiting
Budget tracker
$2.12M approved · $868k spent · $2.08M FAC
WBSCategoryApprovedFACActualVarianceStatus
3.1
Earthworks
$320,000$315,000$298,000+$5,000on_track
3.2
Concrete supply
$214,000$228,000$105,000−$14,000watch
4.1
Drainage pipe
$480,000$480,000$210,000$0on_track
5.2
Site setup
$48,000$52,200$50,400−$4,200over
People
8 stakeholders · 2 manage closely
Stakeholder register + 4-quadrant map placeholder
Variations
5 total · 2 in flight · $42k pending
Variations log placeholder